Tower Crane Dismantling Method Statement ✰ «LATEST»
: Use of radio services for coordination between operators, supervisors, and riggers. SafeWork NSW 2. Pre-Dismantling Preparation
The following resources must be verified and present at the tool-box talk prior to commencement. 4.1 Equipment and Tools
Before any structural bolts are loosened, the following preparatory steps must be verified:
Responsible for lifting and lowering the dismantled sections safely to the ground. Communication Protocol tower crane dismantling method statement
The trolley is retracted to the minimum radius and secured. The hook block is lowered and disconnected. Counterweights:
Cranes – Safety – Tower Cranes (European Standard).
Despite meticulous planning, unexpected situations can occur. The method statement must conclude with clear emergency protocols. : Use of radio services for coordination between
: Identification of hazards such as falls from height, falling objects, and mechanical failure. Communication Plan
Chaos on site breeds accidents. The following preparatory steps must be completed 24 to 48 hours before the main lift begins. Site Inspection & Ground Verification
Before any structural bolts or pins are removed, the following preparatory steps must be completed: Counterweights: Cranes – Safety – Tower Cranes (European
A single, designated must be in charge. This person supervises the entire process directly and cannot perform any other role during the dismantling procedure. The team itself must be composed of experienced professionals. In many jurisdictions, the dismantling must be carried out by a specialized team that has obtained the proper qualifications and certifications from construction authorities. The work crew should include a competent crane operator, qualified riggers, and signal persons who are familiar with the specific crane model and the dismantling plan.
Torque wrenches calibrated to the crane manufacturer's specifications.
Finally, dismantle the base frame, outriggers, or bogies and clear all debris from the site. 4. Safety Checks During Work
A designated first aider and a fully stocked medical kit must remain on-site throughout the entire operation. Emergency vehicle access routes must be kept clear at all times.