Wire the chlorine pump or salt system to the ORP relay terminals. System Setup and Calibration Once everything is plugged in, turn on the power switch. Initial Settings Set Date and Time: Use the arrows to set the current clock.

The BECSys5 is highly configurable and supports a wide range of analog and digital inputs. These inputs include various options such as pH, ORP, temperature, conductivity/TDS, flow rate, turbidity, surge pit level, filter pressures, and strainer vacuum.

Only licensed electricians and trained water treatment professionals should perform the installation and electrical wiring. Site Specifications

: Access the program menu by holding the Cal and Up keys for three seconds. becsys5 installation and technical manual

Shut off the main breaker before touching wires. Dry Hands: Never touch electrical parts with wet hands.

: Engineering data regarding power requirements, relay ratings, and communication protocols (such as Ethernet or Serial) for remote monitoring.

: Standard 100BaseT Ethernet provides access to BECSys Live! , a free portal for 24/7 monitoring and mobile notifications (Email/SMS). Wire the chlorine pump or salt system to

Example: High space temperature alarm

| Block | Function | Example Use | |-------|----------|--------------| | AND | Boolean AND | Enable cooling when both fan and T>setpoint | | PID | Proportional-Integral-Derivative | Chilled water valve position | | SCHEDULE | Weekly calendar | Occupied/unoccupied mode | | ALARM | High/low limit | Notify if supply temp > 25°C |

| Parameter | Value | |-----------|-------| | Supply voltage | 24V DC ±20% | | Max power consumption | 60W (base) / 120W (fully loaded) | | Inrush current | <20A for 1ms | | Isolation | 1500V AC (input to ground) | The BECSys5 is highly configurable and supports a

Alternatively, configure manually via each controller’s web page (http:// , default creds: becsys5 / field01 ).

: Features standard Gbit Ethernet and supports remote access via the BECSys Live! web portal and mobile apps. Operation and Maintenance