Run the cable along the floor frame toward the rear of the machine.
: Insert the pin into the top plate and slowly pull the lat bar. Ensure the cables stay inside the pulley grooves.
Cable routing is the most critical stage. Improper routing causes friction, fraying, and unsafe operation. The Dual Trac 20 generally uses two primary cable systems. High Cable (Lat Pulldown) System
Always thread the cable before bolting the pulley wheel into its bracket. High/Lat Cable Routing:
Regularly check for loose hardware, worn parts, or welding cracks. Dp Dual Trac 20 Assembly Manual
Are you missing any (pulleys, specific bolts, or brackets)?
Slide the top selector stem (the central rod with holes) down into the middle of the weight stack.
Used for attaching the seat, backrest brackets, and pulley housing plates.
The Dual Trac system typically utilizes two or three distinct cables depending on the specific sub-model configuration (High Pulley, Low Pulley, and Floating Pulley systems). Run the cable along the floor frame toward
: Specific instructions for using the included cap screws and deck screws to secure the vertical uprights and floor panels. Pulley & Cable Routing
Bolt the onto the center of the base frame.
Check alignment: Ensure the frame is completely square before tightening these specific top-to-bottom structural bolts. Step 5: Press Arm and Seat Assembly
Ensure your ceiling clearance can accommodate the top height of the main upright frames. 2. Tools Required Cable routing is the most critical stage
Tighten the top mast to the main upright frame using two long carriage bolts. Step 4: Cable and Pulley Routing
However, staring at a box of rails, brackets, and hardware can be intimidating. The official manual is thorough, but sometimes you need a "boots on the ground" perspective.
Route the cable straight back along the top crossmember, over a second top pulley, and drop it vertically down toward the weight stack.